Washdown and Decontamination Yards

Project Details

  • Location Camp Letherneck, Afghanistan
  • Customer US Military
  • Description Design Build Vehicle Washdown Yards
  • Scope of work Engineering, procurement, and construction
  • Schedule Completed May 2012

Dover Vantage designed and built these 2 bespoke washdown facilities on Camp Leatherneck, Afghanistan for the maintenance of military vehicles weighing up to 70 tons. Built over 2.5 hectares the two sites had a total water storage of 200,000 gallons for clean and grey water, with a water delivery capacity of over 80 gallons per minute through 5000psi multiple pressure washer systems.

These essential operating systems within their own secure perimeters with vehicle access control and portable lighting towers for 24hr operations were a critical factor in enabling our client to maintain effective equipment.