Togo Boathouse Facility

Project Details

  • LOCATION Lome, Togo
  • CUSTOMER US Army Corp of Engineers
  • DESCRIPTION Design Build of Boathouse and Operations Facility
  • SCOPE OF WORK Engineering, procurement, and construction
  • SCHEDULE Scheduled for completion November 2013

Dover Vantage successfully delivered the Togo Boat House Facility on the Togolese Naval Base in Lome, Togo. This fully turnkey project is being delivered using Dover’s Light Gauge Steel Framing capability. The boathouse facility will provide critical infrastructure and the ability for the Togolese Navy to maintain it’s fleet’s operational fitness.

Key features include:

– 250m2, 3 bay Boathouse with 4.5 meter door height
– 100m2 Annex Operations center and Office
– Complete site works, concrete aprons and gravel pavement
– New site drainage system
– Trenching and underground electrical and water utility lines

Scheduled for completion November 2013