Because

We are the best at what we do

GSA Vehicle Maintenance Warehouse Facility

Project Details

  • Location Camp Letherneck, Afghanistan
  • Customer US Military
  • Description Custom design and construction of Vehicle Maintenance Facility
  • Scope of work Engineering, procurement, and construction
  • Schedule Completed September 2012

Dover Vantage successfully designed and Built this facility for essential camp services aboard Camp Leatherneck, Afghanistan. Providing a clean, climate controlled facility for essential vehicle maintenance in desert temperatures in excess of 50 degrees celsius was a priority for our client and the project had to be delivered against aggressive timelines.

This 750m2 innovative bespoke design was proposed by Dover as an ideal solution. With a clear span of 25m and an even height of 6m it was an innovative and groundbreaking design for Light Gauge Steel Framing. Being lighter and more economical than hot rolled structural steel our steel frame design was a clear advantage.

The project also encompassed all power hookup, 20 ton HVAC units, communications, office and site works. An ambitious project when all delivered in 90 days.

Project Photos