This camp facility for 720 personel comprised of 6 single story multiple accommodation units each housing 120 people as well as ablution facilities. Delivered with bespoke Light Gauge Steel Frame buildings the 2500m2 facility was manufactured and fabricated on-site to be as logistically efficient as possible. The project included force protection bunkers and blast walls for all personnel as well as the power generation farms for all the buildings.

Manufacturing and fabricating the camp accommodation on-site was a key component to the delivery of this project. Efficient logistics in challenging locations is key to cost reductions and timely delivery.